summaryrefslogtreecommitdiffstats
path: root/tests/bugs/glusterd/bug-1245045-remove-brick-validation.t
Commit message (Collapse)AuthorAgeFilesLines
* glusterd: Don't allow remove brick start/commit if glusterd is down of the ↵Atin Mukherjee2015-08-281-0/+54
host of the brick Backport of http://review.gluster.org/#/c/11726/ remove brick stage blindly starts the remove brick operation even if the glusterd instance of the node hosting the brick is down. Operationally its incorrect and this could result into a inconsistent rebalance status across all the nodes as the originator of this command will always have the rebalance status to 'DEFRAG_NOT_STARTED', however when the glusterd instance on the other nodes comes up, will trigger rebalance and make the status to completed once the rebalance is finished. This patch fixes two things: 1. Add a validation in remove brick to check whether all the peers hosting the bricks to be removed are up. 2. Don't copy volinfo->rebal.dict from stale volinfo during restore as this might end up in a incosistent node_state.info file resulting into volume status command failure. Change-Id: Ia4a76865c05037d49eec5e3bbfaf68c1567f1f81 BUG: 1256265 Signed-off-by: Atin Mukherjee <amukherj@redhat.com> Reviewed-on: http://review.gluster.org/11726 Tested-by: NetBSD Build System <jenkins@build.gluster.org> Reviewed-by: N Balachandran <nbalacha@redhat.com> Reviewed-by: Krishnan Parthasarathi <kparthas@redhat.com> Reviewed-on: http://review.gluster.org/11996 Tested-by: Gluster Build System <jenkins@build.gluster.com> Reviewed-by: Kaushal M <kaushal@redhat.com>